Transportation – Resurfacing

City-Wide Resurfacing – Approx. 21 Miles

Project Number: 3

Category: Transportation

Location: City of Fayetteville

Proposed Project Year: 2018-2019

Estimated Cost: $4,550,872

Expenditures: $957,396.78
(as of 4/30/2019)

Approximately 2.4 miles of City street were repaved in 2018 before colder weather made it too difficult to continue. Another 2.4 miles of City streets will be paved in the spring of 2019, with the rest of the City’s sub-par streets to be repaved in the near future.

In total, about 21 miles of City streets will be repaved as part of the 2017 SPLOST program, and this is one of the higher priority projects.

The images below show examples of streets in the City that have been recently repaved and those that have not yet been repaved.

Quadrant 1 Area – Resurfacing

Project Number: 3

Category: Transportation

Location: Quadrant 1

Proposed Project Year: 2018

Estimated Cost: $1,223,376

Quadrant 2 Area – Resurfacing

Project Number: 3

Category: Transportation

Location: Quadrant 2

Proposed Project Year: 2019

Estimated Cost: $1,192,987

Quadrant 3 Area – Resurfacing

Project Number: 3

Category: Transportation

Location: Quadrant 3

Proposed Project Year: 2020

Estimated Cost: $960,167

Quadrant 4 Area – Resurfacing

Project Number: 3

Category: Transportation

Location: Quadrant 4

Proposed Project Year: 2020

Estimated Cost: $1,174,342