Transportation Projects – $7 Million

Project # Project Type
(click to learn more)
Project
Description
SPLOST Fund
Estimate
Expenditures
as of 2/28/2019
3 Resurfacing Milling, patching, leveling, and resurfacing of approximately 21 miles of City roadway $4,550,872 $693,672.58
4 Roundabout Construction of roundabout to add capacity, maintain level of service, and ensure safety $1,200,000 $0
5 Bridge Crossing Construction project to connect the Piedmont Fayette Hospital campus and the West Fayetteville area with the existing path system $600,000 $0
6 Downtown Master Plan Preliminary engineering for road and path network $500,000 $0
7 Multi-use Path Master Plan Design master plan for expansion of the multi-use path system $75,000 $0
8 Median Landscaping Engineering and design of landscaped medians on Hwy. 85 $75,000 $0